Q
|
What is Buildnova.com?
|
|
|
|
A |
Buildnova.com is a construction portal which caters to the needs of the construction industry.
Top
|
|
|
|
Q |
Who are the people behind Buildnova.com?
|
|
|
|
A |
Buildnova.com
is a construction portal promoted by Build Infotech Solutions Pvt.
Ltd.. It is backed by a team of professionals who have experience and
expertise in the construction industry.
Top
|
|
|
|
Q |
Why
should aggregates be added to cement? How do they affect the strength of
concrete?
|
|
|
|
A |
Aggregates
are classed as inert materials as they do not enter into complex chemical
reactions with water. Aggregates are usually classified as fine and coarse
aggregate. Their
characteristics like size, shape, surface texture, grading (particle size
distribution) and mineralogy affect concrete strength in varying degrees. Concrete
mixtures containing larger aggregate particles require less mixing water
than those containing smaller aggregate. However, larger aggregates tend
to form weaker transition zones containing more micro cracks.
A
change in the aggregate grading without any change in the maximum size of
coarse aggregate, and with water/cement ratio held constant, can influence
the concrete strength when this change causes a corresponding change in
consistency and bleeding characteristics of the concrete mixture. A
concrete mixture containing a rough-textured or crushed aggregate would
show somewhat higher strength at early ages than a corresponding concrete
containing smooth or naturally weathered aggregate of similar mineralogy.
A
stronger physical bond between the aggregate and the hydrated cement paste
is assumed to be responsible for this. Differences in the mineralogical
composition of aggregates are also known to affect concrete strength. Top
|
|
|
|
Q |
What
are the standard specifications for 43 and 53 grade cements?
|
|
|
|
A |
The standard specifications of 43 grade
and 53 grade cements are as follows:
| Particulars |
Requirement
of IS : 8112 - 1989 for 43
grade cement
|
|
Requirement
of IS : 12269 - 1987 for 53
grade cement |
| Chemical
Tests |
|
|
|
| 1 |
CaO -
0.7SO3
2.8
SiO2 + 1.2 Al2O3 + 0.65 Fe2O3 |
0.66-1.02 |
|
0.66-1.02 |
| 2 |
%
Al2O3 / % Fe2O3 |
0.66
Min |
|
0.66
Min |
| 3 |
Insoluble Residue (% by mass) |
2.0 Mix |
|
2.0 Mix |
| 4 |
Magnesia (% by mass) |
6.0 Max |
|
6.0 Max |
| 5 |
Sulphur Trioxide, SO3 (% by mass) |
3.0 Max |
|
3.0 Max |
| 6 |
Total Loss on Ignition (% by mass) |
5.0 Max |
|
5.0 Max |
|
|
|
|
| Physical
Tests |
|
|
|
| 1 |
Fineness
(M2/Kg) |
225 Min |
|
225 Min |
| 2 |
Setting Time
(Minutes) |
|
|
|
| a |
Initial |
30 Min |
|
30 Min |
| b |
Final |
600 Max |
|
600 Max |
| 3 |
Soundness |
|
|
|
| a |
LeChantelier Expansion |
10 Max |
|
10 Max |
| b |
Autoclave Expansion |
0.80
Max |
|
0.80
Max |
| 4 |
Compressive
Strength (Mpa) |
|
|
|
| a |
72 +
1 h |
23 Min |
|
23 Min |
| b |
168
+ 2 h |
33 Min |
|
33 Min |
| c |
672
+ 4 h |
43 Min |
|
43 Min |
Top
|
|
|
|
Q |
Please
send me the names of vendors of steel moulded frames for doors &
windows at Hyderabad.
|
|
|
|
A |
There
are two types of steel moulded frames for doors and windows. They are Mild
Steel Doors & Windows and Cold Rolled Formed Sections.
Following
are the vendors dealing with steel moulded frames for doors and windows at
Hyderabad:
NCL
Seccolor,
7th
floor, Raghav Ratna Towers,
Chirag
Ali Lane,
Abids,
Hyderabad.
Ph.
No. 6614489
Email
: nclseccolor@yahoo.com
nclseccolor@rediffmail.com
Roshni Steels
7-2-1668
Behind
Bakelite Hylum,
Anil
Weld Mesh Campus,
Sanathnagar
– 18
Hyderabad.
Ph.
Nos. : 3718602, 3706105
Fax : 3719109
Top
|
|
|
|
Q |
We would like to
know about the Cement Grouting Machine used for repair and crack filling.
We need it for our post construction period in RCC work.
|
|
|
|
A |
Cement grouting Machines are mainly used in honey combing. The manufacturers
of cement grouting machines are
1. KILLICK
NIXON LTD., MUMBAI-40 PSI,140 PSI
2. VIBROMAX-
40 PSI
3. ASHOK
ENGINEERING, KOLKOTTA - 40 PSI, 140 PSI
These services are offered by
1. ACS
Contact
Person: Mr. Wadia, Ph. No. : 98490-44000
2.
REPCON
ENGINEERS
Contact
Person: Mr. Ramesh Prabhakar, Ph. No. : 3243671
3.
ANURADHA
ENTERPRISES
Contact
Person: Mr. Subba Rao, Ph. No. 4051564
Epoxy
Filling is done for filling cracks in RCC. This is done using a normal
grease gun.
Epoxy
chemicals are manufactured and marketed by
|
1.
FOSROC CHEMICALS LTD.
2.
ROOF INDUSTRIES
3.
PIDILITE INDUSTRIES
4.
AQUARON – Meshney Impex |
Top
|
|
|
|
Q |
What
is Arbitration in Construction?
|
|
|
|
A |
Arbitration is one well reputed branch of Civil Engineering Consultancy. It is
more a techno-legal-management consultancy.
Arbitration
is the voluntary submission of a dispute to a disinterested expert neutral
individual for final and legally binding determination. Arbitration, as opposed
to the common court litigation, is not a public forum; therefore, the parties'
privacy is preserved. Only when the award is contested in a court of law, that
it then becomes public; however, this only happens in very rare occasions. The
Award cannot be reviewed by a court, and there is no appeal. Arbitration is a
substitute for a trial and the review of court's decision by the appellate
courts.
Top
|
|
|
|
Q |
What are possible
causes of leakage from slab and remedial measures for the same?
|
|
|
|
A |
|
Possible Leakages |
Remedy |
|
Parapet Wall -
Roof Slab Junction |
Haunching (Gultha)
is to be done with PCC angle fillet. |
|
Leakages in slabs |
Water proofing
treatment in proper methods and modes shall be done to entire slab. |
|
Improper
Compaction |
Vibrate the slab
with Pan Vibrators and Beams with Pin vibrators properly. |
|
Joints while
casting slabs. |
The construction
joints of pannels while casting slabs shall be minimized and proper
treatment shall be done before casting new pannel. |
|
Leakages in
shuttering - cause leakage of cement slurry - causing honey combs in
slab - creating voids. |
Gaps in shuttering
shall be covered to arrest leakages. |
|
Leakages in sunken
slabs of Toilets and Wash areas |
Water proofing
treatment in proper methods and modes shall be done to entire sunken
area and provide spout to outside. |
|
Chajja - Brick
Wall Junction which causes dampness in walls |
Haunching (Gultha)
is to be done with PCC angle fillet.
|
|
Centering and
Shuttering |
Shall be proper,
perfect and firm with bracings to supports, to avoid vibrations in
casted slab while casting other pannel. |
|
Laying concrete |
Batch of Concrete
shall be casted before initial setting time of Cement i.e., before
half an hour |
|
curing |
curing of the slab
shall be done for recommended days by ponding water for roof slab |
|
cover to
reinforcement steel |
Proper cover of
Concrete to Reinforcement Steel for both top and bottom shall be
maintained as per standards. |
| |
Top |
|
|
|
|
Q |
Who is a service provider?
|
|
|
|
A |
A service provider is a person who offers services related to construction such as a consultant, contractor, legal advisor, developer, builder or real estate agent.
Top
|
|
|
|
Q |
Who is a vendor?
|
|
|
|
A |
Any person who deals with the manufacture or sale of building products, materials or construction equipment is a vendor.
Top
|
|
|
|
Q |
What are the benefits I get, if I register as a vendor or service provider at
buildnova.com?
|
|
|
|
A |
Buildnova.com provides a common platform for vendors, service providers and clients to come together for their mutual benefit. It not only enables the vendors and service providers to expand their business by going online but also provides a one stop solution for all construction needs of the customer.
Top
|
|
|
|
Q |
What are the benefits I get if I register as a member?
|
|
|
|
A |
A member can gain access to additional information and services like searching for a suitable vendor, service provider or any product information.
Top
|
|
|
|
Q |
Do I need to pay anything to use this service?
|
|
|
|
A |
No this service is absolutely free for users. Vendors and Service providers can register themselves online who will be authenticated before their information is available online.
Top
|
|
|
|
Q |
How can I advertise about my company or product on your web site?
|
|
|
|
A |
You
may contact us directly either by telephone or through email to advertise
about your company or product on Buildnova.com. Top
|
|
|
|
Q |
As a customer, when can I expect to receive responses from the
vendor or service provider?
|
|
|
|
A |
You
can expect the vendor's or service provider's response within one or two
days. Top
|
|
|
|
Q |
Does Buildnova.com assure delivery to a customer or payment to the
vendor/service provider?
|
|
|
|
A |
No, Buildnova.com does not assure either the vendor, service provider or the customer of delivery, authenticity of services/goods sold, payments or any other matters related with the transaction.
Top
|
|
|
|
Q |
What are the documents to be verified before purchase of a Flat
?
|
|
|
|
A |
Before a flat is purchased, the title and document search has to be conducted by a competent advocate.
Top
|
|
|
|
Q |
What is the difference between built up area, super built up area, and carpet area?
|
|
|
|
A |
Carpet Area is the area of the apartment/building which does not include the area of the walls. Built up Area includes the area of the walls while Super Built up Area includes the built up area alongwith the area under common spaces such as the lobby, lifts, stairs, etc. This term is therefore only applicable in the case of multi-dwelling units.
Top
|
|
|
|
Q |
What are all the important documents one should check before buying any property ?
|
|
|
|
A |
Before purchasing any property, one has to look at the approved layout plan, approved building plan, ownership documents, etc. You are advised to contact an advocate for legal validation of the documents before purchasing.
Top
|
|
|
|
Q |
Upon buying a flat from a builder in a building under construction, what are the permissions and papers that one should check with the builder, so as to ascertain the genunity of the builder?
|
|
|
|
A |
Check the following before buying a flat from a builder in a building under construction:
1)approved plan of the building along with the number of floors.
2)ensure that the floor that you are buying is approved.
3)check if the land on which the builder is building is his or he has undertaken an agreement with a landlord, if so, check the title of the land ownership with the help of an advocate.
4)check the building byelaws as applicable in that area and ensure that the builder is building without any violation of front setback, side setbacks, height, etc.
5)check specifications given in the agreement to sell of the sale brochure. Is he providing the same actually on the ground or not?
6)check the reputation of the builder.
7)ensure that Urban land ceiling NOC(if applicable) has been obtained or not.
8)NOC from water and electricity authorities also have to be obtained.
9)NOC from lift authorities. Top
|
|
|
|
Q |
What are the basic/main Vaastu principles that need to be adhered to in a home?
|
|
|
|
A |
According to Vasthu Shastra there are three forces in action
to create harmony. Wind, water and fire or, vaayu, jal and agni. If these forces are kept in their appropriate places, then
there will be no disturbance. But if water is put in place of fire and
wind in place of water or in any other combination, the forces will start
acting accordingly and create disharmony. Top
|
|
|
|
Q |
What is Vaastu Shastra ?
|
|
|
|
A |
Vaasthu Shastra is an ancient science-cum-philosophy,
based on astrology and Hindu divinities, developed by the sages of yore to
ensure good fortune for the home builder and dweller. It aims at providing
guidelines for proper construction. Its a study of planetary influences on
buildings and the people who live in them. Top
|
|
|
|
Q |
I am buying plot, it is having a reverse slope from north to south. In fact there is a deep valley and the north road is at very highly elevated level. Since this is having a very good view towards south, kindly advice as to how I should construct the house keeping in all the positive features of the valley and the road and also the view ?
|
|
|
|
A |
The plot you mentioned is a highly negative one. The fundamental factor of the levels explained by me can never be achieved in such plot. Since the slope looks to be very steep, it is almost impossible to correct the plot to make it vastu complaint. The difference in levels look to be around 40 feet. As per vastu this plot may create major financial set backs and hamper the growth of the owner. When we consider all the other factors like architecture and engineering, looks and views cannot substitute to create a good vastu plot. How ever as we are not able to consider any of the vastu features to a satisfactory level, the advice is to reject the plot and should not be used for any house. Top
|
|
|
|
Q |
I would like to know if there are any principles related to pillars used in a house. I am constructing a house for which I would like to have your opinion ?
|
|
|
|
A |
There are specific principles to be followed for constructing a house with pillars. The total number of pillars must be even numbered without ending with zero. That means 8,12,14,16 etc. are allowed where as 10,20,30 are not allowed. No pillar should be allowed to be hanging. That means every pillar must have an opposite pillar either in vertical or horizontal directions. The pillars, which are located in the northeast zone, must not be round. If at all they have to be taken round for elevation purposes, they must be having square or rectangular foundation and square or rectangular ending at the roof level.
Incidentally, vastu also specifies about the number of beams and types of beams that should been used. They must be even numbered as in the case of pillars. Top
|
|
|
|
Q |
I am having a factory, which is having a big hillock in the southwest side. As my operations are increasing I would like to expand my factory in any of the directions suggested by you. Kindly advice ?
|
|
|
|
A |
As a general rule expansion of existing business establishments will create problems. As such there are specific considerations to be taken case of while expanding towards south or west.
In your case since there is a hillock in the southwest corner, expanding towards south will create problems. The entire southern portion will become a reversed slope area, which is considered as highly negative.
Expanding towards west will also create problems because the southwest corner will become lower than the southeast area, which is right now having a hillock. Reversing these heights will pose a greater problem and financial expenditure. There are also heavy structures, which must be compensating if the western area is expanded. The newly defined southwest area must not only become high but also very heavy as far as the usage is concerned.
So expansion towards north or east in your case is more desirable and will be as per the vastu principles. Care must be taken to correct the levels as compared to the existing plot. The compound walls and other areas of the new plot must be considered for the location of bore wells and water sumps. They must be relocated in the proper northwest zone of the entire plot. Similarly, the transformers or generators also must be relocated in the newly created southeast zone.
Top
|
|
|
|
Q |
I am having a house, which is having diagonal directions. There is road on both sides of the plot. There is a flowing nalah adjacent to the plot. As the directions are very confusing I would like to clarify details regarding the layout of the rooms. Please clarify my doubts ?
|
|
|
|
A |
I have examined you plot and details of house. As this is a diagonal plot, care must be taken to follow specific vastu rules. There is no choice of taking any liberties with the construction aspect of the house. The road, which is a busy one should be treated as the one containing north, northeast and east directions. Hence the nalah should be treated as forming a part of northwest zone. Though this is negative, it may be positive in some portions of the year.
A. The main entry must be taken from the main road, as this is the powerful zone in the entire plot. The main entry can be left or right side of the front wall. For excellence results it can also taken in the exact centre of the front side. The modern layout of the rooms is in such a way that the cen6tral entry will not be a proper internal arrangement. Hence it is better to take on the right side as this is nearer to both roads.
B. The plot can have series of rooms towards southwest side, which is forming the centre of the backside wall. Care must be taken to have the doors exactly opposite the main door.
C. There can be a side door towards the small roadside. This can be always used as a secondary door only. It is better not to take any doors towards the nalah side. For the moment that side can he restricted to minimum as this can affect health wise also.
D. Avoid taking the first room and last room for kitchen. The first room can be a formal drawing room or living room. The last room can be taken as the master bedroom. Each room must be maintained as a perfect square or rectangle.
E. The attached toilet for the rooms can be taken in the northwest or southeast or south side of the room. Even these toilets should be part of the rectangular rooms only. There should not be any extensions to the rooms for any purposes.
F. The staircase can be taken in the entire backside of the house that is the southwest side. Any construction must not touch the compound walls of the plot in any way.
Top
|
|