1 Identifying the Location of Site
2 Preliminary Survey
3 Detailed Survey, Permissions & Approvals from concerned authorities
4 Soil Testing
5 Designs & Drawings
6     Estimation & Rate Analysis
7     BOQ
8     Tenders
9     Letter of Allotment (LOA)
10     Planning & Scheduling
11 Marking of Site
12 Foundations
i Excavation
ii Anti Termite Treatment
iii PCC
iv Reinforcement Cutting & binding
v RCC of Footings
vi RCC of Pedestals
13 Super Structure
i.    RCC of Columns vii.   Plumbing (Internal Water Supply & Sanitary)
ii.   Centering and Reinforcement fixing viii.  Plastering
iii.  RCC of slab & beams ix.    Painting
iv.  Brick work x.     Flooring
v.   Doors & Windows xi.    Skirting & Dadoing
vi.  Electrical works
14 External Water Supply & Sanitary (Like Septic tank, Man Holes etc)
15 Compound Wall
16 Miscellaneous works
17 Landscaping
18 External Electrification (like Transformer, poles etc)
19 Roads if any (in case of Industrial Projects)
20 Hand over